Water Line Repair at Westridge Elementary |
|
|
Board Goals:
|
|
Enclosure:
|
|
File Attachment:
|
|
Background & Rationale:
|
On March 15th Westridge Elementary had a water main break. This was the second break in less than a month. The second break was approximatly 8 inches in front of the first repair. The entire water line needed replaced due to the poor integrity of the line. |
|
|
Budget to be Charged:
|
|
Motion
|
I move that the Board of Education approve the emergency repair in the amount of 27,436.50 to Lexington Plumbing for the replacement of the water line at Westridge Elementary. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
Josh Hustad - Director of Facility Operations |
|
Signed By: |
|
Dr. Travis Hux - Assistant Superintendent of Support Services |
|
Signed By: |
|
Dr. Steve Shelton - Associate Superintendent of Operations |
|
Signed By: |
|
Dr. Allan Markley - Superintendent |
|
|
|
|
|
|
|